Wi-FI Optimization
Building Tracker
All campus buildings included in the Wi-Fi Optimization initiative, organized by phase. Status columns track each building’s progress through survey/design, installation, and validation as the multiyear rollout proceeds.
| Abbr. | Building Name | Phase | Survey / Design | Installation | Validation |
|---|---|---|---|---|---|
| ANB | ARNO NOWOTNY BUILDING | Phase 1 | — | — | — |
| ARC | ANIMAL RESOURCES CENTER | Phase 1 | — | — | — |
| ART | ART BUILDING AND MUSEUM | Phase 1 | — | — | — |
| ASE | AEROSPACE ENGINEERING BUILDING | Phase 1 | — | — | — |
| BAT | BATTS HALL | Phase 1 | — | — | — |
| BE1 | BEG LAB BLDG (PRC 131) | Phase 1 | — | — | — |
| BE2 | BEG. REPOSITORY (PRC 132) | Phase 1 | — | — | — |
| BE3 | BEG CORE RESEARCH BLDG (PRC 206) | Phase 1 | — | — | — |
| BEG | BEG MAIN BLDG (PRC 130) | Phase 1 | — | — | — |
| BEN | BENEDICT HALL | Phase 1 | — | — | — |
| BME | BIOMEDICAL ENGINEERING BUILDING | Phase 1 | — | — | — |
| BRB | BERNARD AND AUDRE RAPOPORT BUILDING | Phase 1 | — | — | — |
| BUR | BURDINE HALL | Phase 1 | — | — | — |
| BWY | 2616 WICHITA (BRIDGEWAY) | Phase 1 | — | — | — |
| CAL | CALHOUN HALL | Phase 1 | — | — | — |
| CCC | CAPITOL COMPLEX CHILD DEV CTR | Phase 1 | — | — | — |
| CCJ | CONNALLY CENTER FOR JUSTICE | Phase 1 | — | — | — |
| CMA | JESSE H. JONES COMM. CTR. (BLDG. A) | Phase 1 | — | — | — |
| CMB | JESSE H. JONES COMM. CTR. (BLDG. B) | Phase 1 | — | — | — |
| CML | COMAL ST. CHILD DEVELOPMENT CENTER | Phase 1 | — | — | — |
| DEV | DEVELOPMENT OFFICE BUILDING | Phase 1 | — | — | — |
| DFA | E. WILLIAM DOTY FINE ARTS BUILDING | Phase 1 | — | — | — |
| DPI | DELL PEDIATRIC RESEARCH INSTITUTE | Phase 1 | — | — | — |
| EME | ELEC MECH./ENGR.RES.CTR.(PRC 133) | Phase 1 | — | — | — |
| EPS | E.P. SCHOCH BUILDING | Phase 1 | — | — | — |
| FAC | PETER T. FLAWN ACADEMIC CENTER | Phase 1 | — | — | — |
| FC1 | FACILITIES COMPLEX BLDG. 1 | Phase 1 | — | — | — |
| GOL | GOLDSMITH HALL | Phase 1 | — | — | — |
| HCG | HEALTH CENTER GARAGE | Phase 1 | — | — | — |
| HDB | HEALTH DISCOVERY BUILDING | Phase 1 | — | — | — |
| HLB | HEALTH LEARNING BUILDING | Phase 1 | — | — | — |
| HRC | HARRY RANSOM CENTER | Phase 1 | — | — | — |
| HRH | RAINEY HALL | Phase 1 | — | — | — |
| HTB | HEALTH TRANSFORMATION BUILDING | Phase 1 | — | — | — |
| JES | BEAUFORD H. JESTER CENTER | Phase 1 | — | — | — |
| JGB | JACKSON GEOLOGICAL SCIENCES BLDG. | Phase 1 | — | — | — |
| JHH | JOHN W. HARGIS HALL | Phase 1 | — | — | — |
| JON | JESSE H. JONES HALL | Phase 1 | — | — | — |
| LBJ | LYNDON B JOHNSON LIBRARY | Phase 1 | — | — | — |
| LTH | LABORATORY THEATER BLDG. | Phase 1 | — | — | — |
| MAI | MAIN BUILDING | Phase 1 | — | — | — |
| MEZ | MEZES HALL | Phase 1 | — | — | — |
| MRH | MUSIC BUILDING & RECITAL HALL | Phase 1 | — | — | — |
| NHB | NORMAN HACKERMAN BUILDING | Phase 1 | — | — | — |
| NMS | NEURAL AND MOLECULAR SCIENCE BLDG. | Phase 1 | — | — | — |
| NUR | NURSING SCHOOL | Phase 1 | — | — | — |
| PAC | PERFORMING ARTS CENTER | Phase 1 | — | — | — |
| PAR | PARLIN HALL | Phase 1 | — | — | — |
| PAT | J.T. PATTERSON LABS. BLDG. | Phase 1 | — | — | — |
| PCL | PERRY-CASTANEDA LIBRARY | Phase 1 | — | — | — |
| PHR | PHARMACY BUILDING | Phase 1 | — | — | — |
| PMA | PHYSICS, MATH, & ASTRONOMY BUILDING | Phase 1 | — | — | — |
| POB | PETER O'DONNELL JR. BUILDING | Phase 1 | — | — | — |
| PPA | HAL C. WEAVER POWER PLANT ANNEX | Phase 1 | — | — | — |
| PPE | HAL C WEAVER POWER PLANT EXPANSION | Phase 1 | — | — | — |
| PPL | HAL C. WEAVER POWER PLANT | Phase 1 | — | — | — |
| S06 | MAIN ADMINISTRATION BUILDING | Phase 1 | — | — | — |
| S66 | ESTUARINE RESEARCH CENTER | Phase 1 | — | — | — |
| SBS | RED AND CHARLINE McCOMBS FIELD | Phase 1 | — | — | — |
| SEA | SARAH M. & CHARLES E. SEAY BUILDING | Phase 1 | — | — | — |
| SRH | SID RICHARDSON HALL | Phase 1 | — | — | — |
| SV1 | PRC SERVICE CTR TRADES (PRC 136) | Phase 1 | Complete | Complete | Complete |
| TMM | TX SCIENCE & NATURAL HISTORY MUSEUM | Phase 1 | — | — | — |
| TNH | TOWNES HALL | Phase 1 | — | — | — |
| TSC | LEE & JOE JAMAIL TEXAS SWIMMING CTR | Phase 1 | — | — | — |
| UTC | UNIVERSITY TEACHING CENTER | Phase 1 | — | — | — |
| UTX | ETTER-HARBIN ALUMNI CENTER | Phase 1 | — | — | — |
| VPL | VERTEBRATE PALEONTOLOGY (PRC 6) | Phase 1 | Complete | Complete | Complete |
| WAG | WAGGENER HALL | Phase 1 | — | — | — |
| WCH | WILL C. HOGG BLDG. | Phase 1 | — | — | — |
| WCP | WILLIAM C. POWERS, JR. SAC | Phase 1 | — | — | — |
| WEL | ROBERT A. WELCH HALL | Phase 1 | — | — | — |
| WIN | F.L. WINSHIP DRAMA BLDG. | Phase 1 | — | — | — |
| WMB | WEST MALL OFFICE BLDG. | Phase 1 | — | — | — |
| ATT | AT&T EXECUTIVE EDUC & CONF CENTER | Phase 2 | — | — | — |
| BBR | BASKETBALL & ROWING TRAINING FAC | Phase 2 | — | — | — |
| BEL | L. THEO BELLMONT HALL | Phase 2 | — | — | — |
| BHD | BRACKENRIDGE RESIDENCE HALL | Phase 2 | — | — | — |
| CBA | COLLEGE OF BUSINESS ADMINISTRATION | Phase 2 | — | — | — |
| CEE | Name not listed | Phase 2 | — | — | — |
| CHA-CHX | COLORADO APARTMENTS | Phase 2 | — | — | — |
| CP1 | PRC - CNTRL.CHILLING STN. (PRC 129) | Phase 2 | — | — | — |
| CP2 | PRC CHILLING STATION 2 (PRC 202) | Phase 2 | — | — | — |
| CS7 | CENTRAL CHILLING STATION NO. 7 | Phase 2 | — | — | — |
| CW1 | CTR WATER RESOURCES-LAB (PRC 120) | Phase 2 | — | — | — |
| DMC | G. B. DEALEY CENTER FOR NEW MEDIA | Phase 2 | — | — | — |
| ECB | E.E.R.L./C.E.S.E. (PRC 16) | Phase 2 | — | — | — |
| ECJ | ERNEST COCKRELL JR. HALL | Phase 2 | — | — | — |
| ETC | ENGINEERING TEACHING CENTER II | Phase 2 | — | — | — |
| FC2 | FACILITIES COMPLEX BLDG. 2 | Phase 2 | — | — | — |
| FC3 | FACILITIES COMPLEX BLDG. 3 | Phase 2 | — | — | — |
| FC4 | FACILITIES COMPLEX BLDG. 4 | Phase 2 | — | — | — |
| FC5 | FACILITIES COMPLEX BLDG. 5 | Phase 2 | — | — | — |
| FC6 | FACILITIES COMPLEX BLDG. 6 | Phase 2 | — | — | — |
| FC8 | FACILITIES COMPLEX BLDG. 8 | Phase 2 | — | — | — |
| FC9 | CUSTODIAL SERVICES TRAINING FAC | Phase 2 | — | — | — |
| FNT | LARRY R. FAULKNER NANO SCI AND TECH | Phase 2 | — | — | — |
| GAR | GARRISON HALL | Phase 2 | — | — | — |
| GEA | MARY E. GEARING HALL | Phase 2 | — | — | — |
| GEB | DOROTHY L. GEBAUER BUILDING | Phase 2 | — | — | — |
| GRE | GREGORY GYMNASIUM | Phase 2 | — | — | — |
| GSB | GRADUATE SCHOOL OF BUSINESS BLDG. | Phase 2 | — | — | — |
| GWB | GORDON-WHITE BUILDING | Phase 2 | — | — | — |
| L01 | JWC - ADMIN & LIBRARY | Phase 2 | — | — | — |
| L02 | JWC - AUDITORIUM & GALLERY | Phase 2 | — | — | — |
| L03 | JWC - STORE | Phase 2 | — | — | — |
| L04 | JWC - TOWER & CAFE | Phase 2 | — | — | — |
| L11 | JWC - RESEARCH BUILDING | Phase 2 | — | — | — |
| L19 | JWC - ADMISSIONS KIOSK | Phase 2 | — | — | — |
| MBB | MOFFETT MOLECULAR BIOLOGY BLDG. | Phase 2 | — | — | — |
| N24 | 2400 NUECES | Phase 2 | — | — | — |
| NEZ | NORTH END ZONE BUILDING | Phase 2 | — | — | — |
| PAI | T.S. PAINTER HALL | Phase 2 | — | — | — |
| ROC | RESEARCH OFFICE COMPLEX (PRC 196) | Phase 2 | — | — | — |
| SEZ | SOUTH END ZONE | Phase 2 | — | — | — |
| SSB | STUDENT SERVICES BUILDING | Phase 2 | — | — | — |
| STD | DARRELL K ROYAL TX MEMORIAL STADIUM | Phase 2 | — | — | — |
| SUT | SUTTON HALL | Phase 2 | — | — | — |
| SZB | GEORGE I. SANCHEZ BUILDING | Phase 2 | — | — | — |
| TAR | TEXAS ARCHEOLOGICAL RES. LAB (PRC 5) | Phase 2 | — | — | — |
| UIL | UNIV. INTERSCHOLASTIC LEAGUE BLDG. | Phase 2 | — | — | — |
| UNB | UNION BUILDING | Phase 2 | — | — | — |
| UPB | UNIVERSITY POLICE BUILDING | Phase 2 | — | — | — |
| UTA | UT ADMINISTRATION BUILDING | Phase 2 | — | — | — |
| WGB | WHITAKER GATEWAY BUILDING | Phase 2 | — | — | — |
| WPR | WEST PICKLE RESEARCH BLDG (PRC 156) | Phase 2 | — | — | — |
| WRL | LORRAINE F WYER LAB | Phase 2 | — | — | — |
| ACB | ADVANCED COMPUTING BUILDING (205) | Phase 3 | — | — | — |
| ADH | ALMETRIS DUREN RESIDENCE HALL | Phase 3 | — | — | — |
| AFP | ATHLETIC FIELDS PAVILION | Phase 3 | — | — | — |
| AHG | ANNA HISS GYMNASIUM | Phase 3 | — | — | — |
| AND | ANDREWS RESIDENCE HALL | Phase 3 | — | — | — |
| ASR | EXPERIMENTAL AERODYNAMICS (PRC 7) | Phase 3 | — | — | — |
| B00-B67 | BRACKENRIDGE APARTMENTS | Phase 3 | — | — | — |
| BFL | BRACKENRIDGE FIELD LAB | Phase 3 | — | — | — |
| BLD | BLANTON RESIDENCE HALL | Phase 3 | — | — | — |
| BMA | JACK S. BLANTON MUSEUM OF ART | Phase 3 | — | — | — |
| BMK | BLANTON MUSEUM ELLSWORTH KELLY | Phase 3 | — | — | — |
| BMS | BLANTON MUSEUM SMITH BUILDING | Phase 3 | — | — | — |
| BRG | BRAZOS GARAGE | Phase 3 | — | — | — |
| BSB | BASKETBALL SUPPORT BLDG (REC SPORT) | Phase 3 | — | — | — |
| CDL | COLLECTIONS DEPOSIT LIBRARY | Phase 3 | — | — | — |
| CLK | CAVEN CLARK FIELD SUPPORT BUILDING | Phase 3 | — | — | — |
| CM4 | CMRG - RESEARCH OFFICES (PRC 201) | Phase 3 | — | — | — |
| CMR | CMRG CONCRETE DURABIL. CTR. (PRC18B) | Phase 3 | — | — | — |
| COM | COMPUTATION CENTER | Phase 3 | — | — | — |
| CPR | COLLECTIONS PRES & RESEARCH PRC 176 | Phase 3 | — | — | — |
| CRB | COMPUTATIONAL RESOURCE BUILDING | Phase 3 | — | — | — |
| CRD | CAROTHERS RESIDENCE HALL | Phase 3 | — | — | — |
| CS3 | CENTRAL CHILLING STATION NO. 3 | Phase 3 | — | — | — |
| CS4 | CENTRAL CHILLING STATION NO. 4 | Phase 3 | — | — | — |
| CS5 | CENTRAL CHILLING STATION NO. 5 | Phase 3 | — | — | — |
| CS6 | CENTRAL CHILLING STATION NO. 6 | Phase 3 | — | — | — |
| CWE | CTR. WATER & ENVIRONMENT (PRC 119) | Phase 3 | — | — | — |
| D01 | CENTRUM BUILDING IN DALLAS | Phase 3 | — | — | — |
| D21 | DOBIE TWENTY21 | Phase 3 | — | — | — |
| DFF | UFCU DISCH-FALK FIELD | Phase 3 | — | — | — |
| DI1 | DISCOVERY TO IMPACT INNOVATION TWR | Phase 3 | — | — | — |
| DI2 | DISCOVERY TO IMPACT INNOVATION LAB | Phase 3 | — | — | — |
| ECG | EAST CAMPUS GARAGE | Phase 3 | — | — | — |
| EER | ENGR EDUCATION AND RESEARCH CENTER | Phase 3 | — | — | — |
| F20 | BIO. SCI. EXP. FIELD LAB. | Phase 3 | — | — | — |
| F22 | BFL - GREENHOUSE F22-1 | Phase 3 | — | — | — |
| FDH | J. FRANK DOBIE HOUSE | Phase 3 | — | — | — |
| FS1 | FERGUSON ENGR LAB ANNEX (PRC 177) | Phase 3 | — | — | — |
| FS2 | NEES@UTEXAS/FSL LAB ANNEX (PRC 46) | Phase 3 | — | — | — |
| FSL | FERGUSON LAB.- MAIN BLDG. (PRC 24) | Phase 3 | — | — | — |
| G18-G56 | GATEWAY APARTMENTS | Phase 3 | — | — | — |
| GDC | GATES DELL COMPLEX | Phase 3 | — | — | — |
| GHA | GRADUATE HOUSING, UNIT A | Phase 3 | — | — | — |
| GHB | GRADUATE HOUSING, UNIT B | Phase 3 | — | — | — |
| GHC | GRADUATE HOUSING, UNIT C | Phase 3 | — | — | — |
| GHD | GRADUATE HOUSING, UNIT D | Phase 3 | — | — | — |
| GHE | GRADUATE HOUSING, UNIT E | Phase 3 | — | — | — |
| GHF | GRADUATE HOUSING, UNIT F | Phase 3 | — | — | — |
| GLT | GARY L THOMAS ENERGY ENGR BLDG | Phase 3 | — | — | — |
| HMA | HOGG MEMORIAL AUDITORIUM | Phase 3 | — | — | — |
| HSM | WILLIAM RANDOLPH HEARST BLDG | Phase 3 | — | — | — |
| HYD | CEM HYDROGEN DEMO SITE (PRC 214) | Phase 3 | — | — | — |
| IC2 | 2815 SAN GABRIEL (IC2 INSTITUTE) | Phase 3 | — | — | — |
| ICB | INTRAMURAL CONTROL BLDG. | Phase 3 | — | — | — |
| IPS | PLAZA 290 (IPSI RENTAL) | Phase 3 | — | — | — |
| JCB | JOHN S. & DRUCIE CHASE BUILDING | Phase 3 | — | — | — |
| JCD | JESTER RESIDENCE HALL | Phase 3 | — | — | — |
| KEY | UNIVERSITY KEY BUILDING | Phase 3 | — | — | — |
| KIN | KINSOLVING RESIDENCE HALL | Phase 3 | — | — | — |
| LAC | LAKE AUSTIN CENTRE | Phase 3 | — | — | — |
| LCH | LITTLEFIELD CARRIAGE HOUSE | Phase 3 | — | — | — |
| LFH | LITTLEFIELD HOME | Phase 3 | — | — | — |
| LNA | LEONA ST. CHILD DEVELOPMENT CENTER | Phase 3 | — | — | — |
| LTD | LITTLEFIELD RESIDENCE HALL | Phase 3 | — | — | — |
| MAG | MANOR GARAGE | Phase 3 | — | — | — |
| MER | MICROELECT. & ENGR.RES.CTR. (PRC 160) | Phase 3 | — | — | — |
| MFH | RICHARD MITHOFF TRK/SCR FIELDHOUSE | Phase 3 | — | — | — |
| MHD | MOORE-HILL RESIDENCE HALL | Phase 3 | — | — | — |
| MMS | MIKE A. MYERS TRACK & SOCCER STADIUM | Phase 3 | — | — | — |
| MNC | MONCRIEF-NEUHAUS ATHLETIC CENTER | Phase 3 | — | — | — |
| MPT | MEDICAL PARK TOWER | Phase 3 | — | — | — |
| MR1 | MONTOPOLIS OFFICE TOWER | Phase 3 | — | — | — |
| MR2 | MONTOPOLIS FABRICATION BUILDING | Phase 3 | — | — | — |
| NEL | NUCLEAR ENGR. TEACHING LAB. (PRC 159) | Phase 3 | — | — | — |
| NOB | NORTH OPERATIONS BUILDING (PRC 197) | Phase 3 | — | — | — |
| P19 | PRC CUSTODIAL/SAFETY/GUARDS (PRC19) | Phase 3 | — | — | — |
| P25 | PRC SUPPLY CENTER (PRC 25) | Phase 3 | — | — | — |
| P30 | RECORDS STRG. #1-PETEX/K16C (PRC 30) | Phase 3 | — | — | — |
| P45 | UT PHYSICAL PLANT WAREHOUSE (PRC45) | Phase 3 | — | — | — |
| PHD | PRATHER RESIDENCE HALL | Phase 3 | — | — | — |
| PX3 | PETEX (PRC 2) | Phase 3 | — | — | — |
| RHD | ROBERTS RESIDENCE HALL | Phase 3 | — | — | — |
| RLP | PATTON HALL | Phase 3 | — | — | — |
| RRH | ROBERT B. ROWLING HALL | Phase 3 | — | — | — |
| RSC | RECREATIONAL SPORTS CENTER | Phase 3 | — | — | — |
| SAG | SAN ANTONIO GARAGE | Phase 3 | — | — | — |
| SJG | SAN JACINTO GARAGE | Phase 3 | — | — | — |
| SJH | SAN JACINTO RESIDENCE HALL | Phase 3 | — | — | — |
| SV2 | PRC SVC.CTR./AUTO. & GRNDS. (PRC 135) | Phase 3 | — | — | — |
| SW7 | 2617 SPEEDWAY (OFC. BLDG.) | Phase 3 | — | — | — |
| SWG | SPEEDWAY GARAGE | Phase 3 | — | — | — |
| TCB | J NEILS THOMPSON COMMONS (PRC 137) | Phase 3 | — | — | — |
| TCC | JOE C THOMPSON CONFERENCE CENTER | Phase 3 | — | — | — |
| TM1 | NON-VERT. PALEONTOLOGY LAB (PRC 122) | Phase 3 | — | — | — |
| TRG | TRINITY GARAGE | Phase 3 | — | — | — |
| TSG | 27TH STREET GARAGE | Phase 3 | — | — | — |
| TTC | TEXAS TENNIS CENTER | Phase 3 | — | — | — |
| UA9 | 2609 UNIVERSITY AVENUE | Phase 3 | — | — | — |
| USA | UNIV. ELEM. SCHOOL ADMIN. BLDG. II | Phase 3 | — | — | — |
| USB | UNIV. ELEM. SCH. GYM AUDITORIUM CAFE | Phase 3 | — | — | — |
| WWH | WALTER WEBB HALL | Phase 3 | — | — | — |
Complete In progress — Not yet started Status fills in once a building's work begins.